Saudi Arabia, Ras Tanura Terminal - Safety Regulations and Inspections
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
The following notes are intended to provide an explanation of the reasoning behind the clauses of the BIMCO Bunker Terms 2018 that are not self-explanatory. Clause 1 - Definitions Clause 2 – Specifications/Grades/Quality Clause 3 – Quantities/Measurements Clause 4 – Sampling Cla... Please follow the link to continue reading.
MEMBER CONTENT – login using the orange button at the top of the page to view.
Structure Annex A – Vessel Specification Annex B – Insurance Definitions Clause 1 (Charter Period) Clause 2 (Delivery and Redelivery) Clause 3 (Condition of Ship) Clause 4 (Structural Alterations and Additional Equipment) Clause 5 (Surveys, Audits and Inspe... Please follow the link to continue reading.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
The following Explanatory Notes are intended to highlight some of the key issues and provisions of BIMCHEMTIME 2005 and to provide background information in respect of the thinking behind some of the clauses. Layout Commercial provisions Preamble and Clause 1 (Charter Period) Clause 2 (Port... Please follow the link to continue reading.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.