Italy - National holidays 2019
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
MEMBER CONTENT – login using the orange button at the top of the page to view.
The Australia Maritime Safety Authority (AMSA) updates the temporary arrangements during COVID-19 relating to the maximum period of shipboard service allowed for seafarers under the Maritime Labour Convention, 2006 (MLC,2006).
As the COVID-19 pandemic continues, some ships are experiencing operational challenges, such as shipyards or dry docks closing down. In addition, surveys and audits can in some cases not be conducted because surveyors are unable to attend the ships due to travel restrictions or quarantines.