BIMCO Search Results

Explanatory notes

 The following Explanatory Notes are designed to provide some background information on the clauses of the various parts of the contract. Part I  Box 1 - Place and Date  Box 2 - Owners (Full style and address) Box 3 - Contractors (Full style and address) Box 4 - Vessel’s... Please follow the link to continue reading.

Background

REPAIRCON is the standard contract for use in connection with major ship repairs, in a wet or dry dock, at a shipyard or similar facility. The form was originally issued in 2002. In the light of experience and changes in practice over the intervening period, a Subcommittee, comprising representative... Please follow the link to continue reading.

Explanatory notes

Redelivering a ship at the end of a time charter party can sometimes result in a dispute between the owners and the charterers. The charterers may attempt to redeliver the ship before the end of the minimum charter period, or deliver it late. Charter parties are sometimes unclear about how and when ... Please follow the link to continue reading.

Slew of new contracts and clauses top BIMCO committee’s upcoming meeting

Projects for standard contracts and clauses covering almost every sector of the shipping industry will be reviewed by BIMCO’s Documentary Committee (DC) when it meets on 21 and 22 September. The gathering of over 70 documentary experts from around the world will take place online for the first time ... Please follow the link to continue reading.

About "about"

MEMBER CONTENT – login using the orange button at the top of the page to view.

Ukraine - Sewage

MEMBER CONTENT – login using the orange button at the top of the page to view.